Head Rest Product process.

Manufacturing Process for the Brazed Parts ( STS Oil Cooler)
-
1) Part Sub Ass’y
- Inner & Outer Pipe
- Inner Fin -
2) Oil cooler Ass’y
- Fitting Flange
- Oil Pass Pipe -
3) End Forming
- End Forming Press
(Ass’y Fixed) -
4) Weld Ring Ass’y
- Weld Ring Ass’y
-
5) Brazing
- Furnace Brazing
-
6) Inspection
- Submerged Leak Test
- Final Inspection -
7) Dry & Marking
- Water Dry
- Lot Marking -
8) Packing & Delivery
- Packing & Delivery

Manufacturing Process for Headrest Pipes
-
1) UNCOILER
-
2) FORMING
-
3) H/F WELDING
-
4) PIPE CALIBRATION
-
-
5) CUTTING
-
6) BURR BRUSH